Two 90 degree conduits, for electric and phone, were set in place. The concrete was poured and finished. And bolts to secure the new walls were inserted in the perimeter before it cured. | The shingles, sheathing, and rafters were removed. I saved any wood that could be used again. The garage door was left intact, including the header. Then the siding on the soon to be interior wall was removed and saved. |